Modular Pyrolysis Systems

Factory-built, shipped to your site, operational in 12–18 months. Start with one module, add capacity as your market grows. No multi-billion-dollar megaplant required.

Request Equipment Quote

Why Modular?

Factory-Built Quality

Built under controlled conditions with rigorous QA — not a field-constructed project subject to weather and site constraints.

Faster Deployment

12–18 months from contract to operation vs. 5–7 years for a greenfield biorefinery. Start generating revenue sooner.

Lower Capital Risk

Start with one module at $2–5M instead of betting $50M+ on day one. Prove your feedstock and markets first.

Scale Incrementally

Add modules as demand grows. Multiple units combine to achieve 200+ TPD without redesigning the plant.

Available Configurations

5

5 TPDMicro

Single sawmill, farm operation, or pilot facility

Bio-Oil

3–3.5 tons/day

Biochar

0.75–1.25 tons/day

Footprint

40 × 20 ft

Capital

$2–5M

10

10 TPDSmall

Small commercial wood processing or agricultural operations

Bio-Oil

6–7 tons/day

Biochar

1.5–2.5 tons/day

Footprint

50 × 25 ft

Capital

$3–7M

25

25 TPDMid-Scale

Commercial biomass processors, municipalities, cooperatives

Bio-Oil

15–18 tons/day

Biochar

3.75–6.25 tons/day

Footprint

60 × 30 ft

Capital

$8–18M

50

50 TPDLarge

Large industrial operations, regional waste processors

Bio-Oil

30–35 tons/day

Biochar

7.5–12.5 tons/day

Footprint

80 × 40 ft

Capital

$15–25M

75

75 TPDIndustrial

Major industrial scale, utility-grade operations

Bio-Oil

45–52 tons/day

Biochar

11–19 tons/day

Footprint

100 × 50 ft

Capital

$20–30M

200+ TPD? Combine Multiple Units

Stack two or more modules for throughputs exceeding 200 metric tons per day. Each unit operates independently — so maintenance on one module doesn't shut down the whole plant.

Deployment Timeline

Typical project: 9–14 months from contract to operation.

12–3 months

Engineering & Design

Feedstock analysis, system sizing, site planning

24–6 months

Fabrication

Factory build, quality testing, pre-assembly

32–3 months

Shipping & Installation

Transport, site prep, mechanical installation

41–2 months

Commissioning

Startup, tuning, operator training, handoff

Find the Right System for Your Operation

Tell us about your feedstock and throughput requirements. We'll recommend the right configuration and walk you through the numbers.

Chat with us